Junior Member
|
|
Join Date: Jul 2010
Posts: 57
|
|
Junior Member
Join Date: Jul 2010
Posts: 57
|
Thanks for providing me a ball park guess. I know from prior experience with WC system that things run very slow even with a 45 day limit as imposed in Cal WC anyway. I waited more than twice that long for my first QME report and luckily was able to throw it out due to them missing the timeliness requirements by so long. My second (new) QME was a bit more thorough and more favorable to me besides.
|