ALS News & Research For postings of news or research links and articles related to ALS


advertisement
Reply
 
Thread Tools Display Modes
Old 01-29-2008, 03:38 PM #1
BobbyB's Avatar
BobbyB BobbyB is offline
In Remembrance
 
Join Date: Aug 2006
Location: North Carolina
Posts: 4,609
15 yr Member
BobbyB BobbyB is offline
In Remembrance
BobbyB's Avatar
 
Join Date: Aug 2006
Location: North Carolina
Posts: 4,609
15 yr Member
Default Duke Energy Gets Plant's Final Air Permit; Construction to Begin

Duke Energy Gets Plant's Final Air Permit; Construction to Begin
By IEVA M. AUGSTUMS
AP Business Writer

Posted: Today at 12:41 p.m.
Updated: Today at 1:22 p.m.

CHARLOTTE, N.C. — Duke Energy Corporation received the final OK from state environmental regulators Tuesday to build a coal-fired power generator in western North Carolina.

The Charlotte-based utility was given its final air permit to build an 800-megawatt unit, and company officials said they plan to begin construction immediately. The permit imposes emissions standards stricter than federal or state requirements for sulfur dioxide and nitrogen oxide, and mercury standards tougher than federal limits.

"This is the final milestone prior to beginning construction on the new unit, which will serve increasing customer demand and population growth in the Carolinas," said James L. Turner, Duke Energy president and chief operating officer.

Construction is expected to take four years, and officials said it will create 1,600 new jobs with a total payroll of about $100 million. The cost of the plant stands at $2.4 billion.

Once the unit is operational, Duke Energy said it will shut down four smaller coal-burning plants, all built in the 1940s. The generator is an upgrade to Duke Energy's Cliffside plant, which straddles Rutherford and Cleveland counties, about 50 miles west of Charlotte.

The project has been strongly opposed by several environmental groups, and many have accused Duke Energy of not fully considering the use of conservation efforts and renewable fuels, such as solar and wind power.

One group said Tuesday the generator will "increase hazy skies, worsen acid rain, and deposit large amounts of toxic mercury" in Great Smoky Mountains National Park, the county's most-visited national park.

"While permit improvements have been made that could lessen impact on the Smokies, no one can know for sure because the state has excused Duke from fully analyzing the fate of its pollution," said Stephanie Kodish, an attorney for the Coal Litigation Program National Parks Conservation Association.

The company originally sought a permit for two new 800-megawatt coal-fired units, but won permission from the North Carolina Utilities Commission to build only one generator at the site.

Most expected the permit to be granted, but the legal challenges and appeals promised by opponents on the upgrade could drag on for more than a year. In that time, the cost of the plant - which increased from $1.53 billion in March to its current $2.4 billion - could rise again.

Environmental groups said they will try to delay the project until it Duke Energy no longer considers it a cost-effective solution.

http://www.wral.com/news/state/story/2368133/
__________________

.

ALS/MND Registry

.
BobbyB is offline   Reply With QuoteReply With Quote

advertisement
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
ALS sufferer finds hope in construction of new home BobbyB ALS News & Research 0 06-17-2007 06:30 AM
Scott finally got his driving permit!!!! FeelinGoofy Tourette Syndrome 10 01-18-2007 03:33 PM


All times are GMT -5. The time now is 09:16 AM.

Powered by vBulletin • Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.

vBulletin Optimisation provided by vB Optimise v2.7.1 (Lite) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.
 

NeuroTalk Forums

Helping support those with neurological and related conditions.

 

The material on this site is for informational purposes only,
and is not a substitute for medical advice, diagnosis or treatment
provided by a qualified health care provider.


Always consult your doctor before trying anything you read here.